This is an informational page regarding the Sidewalk and Sewer line project on East Main Street from the Beaver Street intersection to Beaver Brook Bridge. Please check back often as important updates will be posted as needed.
WEEK OF MAY 18TH
No major work planned. The contractor may be doing some minor work like installing some signs, preparing for erosion control and starting to bring in some equipment.
If you have any questions or concerns about the sidewalk, please contact Gretchen Havreluk at 802-464-8591 ext. 117
For questions regarding the sewer extension, please contact John Lazelle at 802-464-3862.
VHB is the Engineering firm for the project.
Waters Excavation, Inc. is the general contractor for the project.
Final Drawings!
Wilmington East Main 1 Final Plans
From the 2018 Asset Management Final Report
“EAST MAIN STREET 1
Similar to West Main Street, East Main Street 1 (as shown on Figure 3) requires extending the
existing public sewer line west approximately 520 linear feet in order to connect (5) five of the (6)
six structures currently serviced by the East Main 1 Private sewer. Services for numbers 28, 34,
36, 38 and 40 would be connected to the new sewer as part of this work.
#37 would remain on the existing private sewerline for the foreseeable future due to the building
service location and elevation.”
East Main 1 from Asset Management Final Report
Wilmington Asset Management Final Report 8 23 2018 with all data