Effluent flow meter pit!
Lagoon #1 aeration
RBC effluent
RBC’s
Lagoon 1 (left), lagoon 2 (right). Lagoon 2 is the colder of the two and freezes every winter!
RBC’s
Clarigester arm showing the multiples repairs that have been done over the years!
Clarigester skimmer arm! The original part broke and we now have to use a mud flap!
Clarigester
Clarigester
Clarigester drive unit
Clarigester
Clarigester
Control building lower level
Chlorine injection point
Old aeration system purge lines.
Lagoon aeration blowers
Control Building
Clarigester and RBC’s
Clarigester
Headworks
Manhole #16 in beaver brook after
Manhole #16
Manhole #16 before repairs
Manhole #16
Sealed Manhole with inflow protector
Sealed manhole to limit infiltration
Repaired / sealed manhole
Google Earth view of the WWTP
Lagoon 2 ice
Dewatering biosolids
Operator Jeff Longe
Chief Operator John Lazelle
Ducks resting on aeration line
RBC
Manhole #16
Collection System
Jeff Longe and Bill Hunt
Inside the mixer!
Filling the mixer!
Inside the Comptainer!
Filling the Comptainer!
Our new 2014 Ford F350 truck.
Near Dot’s after Irene.
John giving the Selectboard a tour of the damage after Irene.
Pump Station #1 after Irene!
Near Pneumatic Ejector Station #1 after Irene!
West Main Street a day or two after Irene!
Pump Pump Station #1 after Irene!
Wilmington Sewer District