Posted by & filed under Uncategorized.

On Saturday May 13th, while excavating for the Southern bridge abutment, Daniels Construction discovered that the bedrock directly beneath the proposed abutment was significantly lower than anticipated.
On the morning of May 15th, Daniels notified the design engineer of this differing site condition and we’re currently waiting to receive instructions on how to proceed.

Comments are closed.